What Is a BSC or BESC Number in Shipping?
BSC (Bordereau de Suivi des Cargaisons) and BESC (Bordereau Électronique de Suivi des Cargaisons) are the French names for the cargo tracking note. The BSC or BESC number is the reference that goes on the Bill of Lading.
Last updated: November 2026
What Is a BSC or BESC Number in Shipping?
BSC and BESC are the French names for the cargo tracking note. BSC means Bordereau de Suivi des Cargaisons. BESC means Bordereau Électronique de Suivi des Cargaisons, the electronic version. The BSC or BESC number is the reference the destination country’s shippers’ council gives one shipment. It goes on the Bill of Lading, and customs at the port of discharge checks it before the cargo clears.
French-speaking African countries use these names. English-speaking countries call the same document an ECTN or a CTN.
BESC and BSC in English
| Name | Full form | English |
|---|---|---|
| BESC | Bordereau Électronique de Suivi des Cargaisons | Electronic Cargo Tracking Note (ECTN) |
| BSC | Bordereau de Suivi des Cargaisons | Cargo Tracking Note |
People search for “BESC certificate”, “BESC document”, “BESC no” and “BSC number”. All of them mean the same filing.
Countries that use BESC or BSC
| Country | Name on the certificate | When it must be done |
|---|---|---|
| Benin | BESC | Validated before the cargo is discharged at Cotonou |
| Burundi | BESC | Original Bill of Lading within 5 working days of pre-validation |
| Cameroon | BESC | Validated at least 48 hours before the vessel arrives |
| Central African Republic | BESC | Obtained at the port of loading, before loading |
| Chad | BESC | Deadline confirmed per shipment |
| Guinea | BESC | Validated at least 5 days before the vessel arrives |
| Mali | BESC | Issued at origin; border issuance stopped on 15 February 2020 |
| Niger | BESC | Number from the draft, printed on the original Bill of Lading |
| Togo | BESC | Final validation within 7 business days of pre-validation |
| Ivory Coast | BSC | No fixed deadline; cargo without it is returned |
| Madagascar | BSC | Validated at least 3 days before the import declaration |
| Senegal | BSC | Changes after validation carry a penalty fee |
How the BESC number is created
Most BESC countries work in two steps.
- Pre-validation. We check the draft Bill of Lading, commercial invoice and freight invoice and file the draft. The council creates the BESC number.
- Final validation. The BESC number goes on the original Bill of Lading. We send the original, with place and date of issue, shipped-on-board date, signature and stamp. The council validates the certificate.
The window between the two steps is short. In Togo it is 7 business days, in Burundi 5 working days. Miss it and the system cancels the certificate. Recovering it costs a penalty fee.
From the filing desk
The most common BESC problem we see is a name that differs between documents. The consignee is “SARL X” on the invoice and “X Ltd” on the Bill of Lading. The council rejects it, and the shipper loses days. We compare every name, weight and value across documents before the draft goes in.
Frequently asked questions
What is the full form of BESC? Bordereau Électronique de Suivi des Cargaisons, the electronic cargo tracking note.
What is a BSC number in shipping? The reference number of a cargo tracking note (Bordereau de Suivi des Cargaisons). It goes on the Bill of Lading.
What is the difference between BSC and BESC? BESC is the electronic version of the BSC. The country decides which name is printed on the certificate.
Is a BESC the same as an ECTN? It does the same job. BESC is the French name, ECTN is the English name. See the ECTN vs BESC vs BSC vs CTN comparison.
Can a BESC be changed after validation? Usually yes, for a fee. In Benin an amendment costs 25% of the certificate fee. Madagascar allows no change after validation.
Send your draft Bill of Lading, commercial invoice and freight invoice to sck@scktr.com. We check every document before the council sees it.
Get Your Certificate
Apply for your ECTN / BESC certificate now. Fast draft, no hidden fees.